Barataria Bay Project

    Objective: Conduct Barataria Bay Bathymetry and Hydrodynamics Surveys post construction of levees and determine the changes as well as the cause of change.Two sets of (a total of five) surveys were conducted in the winter of 2013 and summer of 2015.Half dozens of instruments were used to measure hydrodynamics conditions over one year plus time period.